Pular para o conteúdo principal

Questão de Inglês — Interpretação de texto | Reading comprehension — IDCAP 2025

InglêsInterpretação de texto | Reading comprehension
Código
qg518638
Banca
IDCAP
Órgão
OGMOs - PE
Ano
2025
Nível
Fundamental
Cargo
Trabalhador Portuário Avulso (TPA) - Categoria Conferente
What was the finding of the National Transportation Safety Board regarding the ship's power loss?
  1. AThe ship's anchor damaged a nearby power line.
  2. BA cable meant for blackout protection was disconnected.
  3. CA software update was not installed correctly.
  4. DThe radar system failed due to operator error.
Revelar gabarito e comentário

GabaritoB — A cable meant for blackout protection was disconnected.

Link permanente: /questoes/qg518638